WORKS CASE

Serving more than 80 countries around the world
Domestic Case International Case
Ningbo Metro Line 1

Project Location: Ningbo, China Application products: porcelain aluminum plate / metal ceiling Overview: The main line of the first phase of Ningbo Rail Transit Line 1 is 20.878km long, starting from Gaoqiao West Station and ending at Donghuan South Road Station. The total length of the main line is 20.878km, of which the overhead line is 5.45km, the length of the bridge and the U-shaped trough is 0.31km, and the underground line is 15.118km. There are 15 underground stations and 5 elevated stations with an average station spacing of 1.14km.